Infrastructure That Works

A project is done when the water drains, the sidewalk is walkable, and the road is open.

District 10 residents have heard "it's coming" for years. The Moncrief Road project was pushed by Councilwoman Pittman since 2018 before construction finally started in 2026. The Ribault River resilience parks are still at the land-acquisition stage. The question isn't whether the city can do these things. It's whether anyone is forcing it to finish.

Here's the concrete plan. Every item has a dollar figure, a deadline, and a public progress tracker.

1

Finish the Moncrief Road Beautification Project—and publish the completion date

Construction on the roughly 10-block stretch between 34th and 45th Street began in early 2026, with a roundabout at Moncrief and 45th, road resurfacing, crosswalks, a multi-use path, and better pedestrian lighting. Expected completion: late 2027 or early 2028.

The commitment

Post a public progress dashboard for Moncrief Road—updated monthly—showing percent complete, dollars spent, and any delay. If the contractor falls behind, the district gets a public explanation. Show the calendar.

2

Lock in the Ribault River flood mitigation—before the next storm

The city moved to acquire three parcels along the Ribault River for $1.818 million to create resilience parks that manage floodwaters and prevent additional flooding from impervious development in the flood zone. This is exactly the kind of upstream investment District 10 needs.

The commitment

Require the Parks Department to publish the acquisition timeline and the construction start date for the resilience parks within 90 days of purchase. Flood mitigation money that sits in a land bank doesn't protect anyone.

3

Expand the FEMA flood property buyout program—and prioritize District 10

The city has used FEMA Hazard Mitigation funding to acquire and demolish a repeatedly flooded property at 4635 Wrico Drive (32209), converting it to permanent green space. That's the right model. But one property at a time is not a strategy.

The commitment

Direct the Public Works Department to identify every persistently flooded residential property in District 10 and publish a prioritized buyout list with timelines. If FEMA money is available, District 10 should be first in line.

4

Stormwater maintenance: follow the CDBG money to District 10's low-income tracts

The Capital Improvement Plan includes $3,310,563 in CDBG-funded Right of Way and Stormwater Maintenance specifically targeted to low- and moderate-income tracts. District 10 qualifies.

The commitment

Require Public Works to publish the street-by-street list of where this CDBG stormwater money is spent in District 10. If ditches are being cleaned and culverts replaced, residents should see their street on the schedule—not find out after the third flood.

5

Sidewalks and curbs: 246 ramps is a start. Publish the gap map.

The city's own "Promises Kept" page claims 246 accessible curb ramps built in District 10, alongside 324 lighting improvements. That's real work. But residents still know which blocks are missing sidewalks entirely.

The commitment

Publish a District 10 Sidewalk and Curb Gap Map—block by block—showing what exists, what's funded, and what has no timeline. Then prioritize the gaps that force kids to walk in the street on routes to school.

6

Make finishing the project a budget condition

The city's Five-Year Capital Improvement Plan lists dozens of projects across Jacksonville. District 10's share needs a dedicated tracker.

The commitment

Introduce a requirement that any capital project in District 10 exceeding $500,000 must have a public project page with: total budget, amount spent to date, percent complete, projected completion date, and a contact person. If a project is delayed more than 90 days, the Council member must explain why at a public meeting.